The Challenge

Required quiet, grid-like power for remote mine camp.

A mine camp in the Gold Fields region needed reliable powe to operate and serve as an emergency power source for critical equipment in the camp.

PROJECT FACT FILE

  • 2x 400kVA

    Three phase Denyo Generator

The Solution

The installation of two three-phase Denyo Generators.

Blue Diamond supplied 2 x Denyo DCA-400SPKII 3 phase generators to produce an extremely quiet power within a user-friendly operation. It also included simplified maintenance, fully appointed control panels and designed for easy transportation.

The Outcome

Reliable, quiet power for ongoing mine camp operation.

The installation of the generators ensured the successful running of the Goldfields mine camp with robust, efficient power for an ongoing operation without severe noise disruption.